{"id":19382,"date":"2023-12-11T11:53:56","date_gmt":"2023-12-11T10:53:56","guid":{"rendered":"https:\/\/ansee.pl\/?post_type=case-studies&#038;p=19382"},"modified":"2026-05-28T18:45:19","modified_gmt":"2026-05-28T16:45:19","slug":"consulting-and-fulfillment-of-esap-reporting-obligations-to-the-ebrd-in-connection-with-the-construction-of-the-banie-3-wind-farm","status":"publish","type":"case-studies","link":"https:\/\/ansee.pl\/en\/our-projects\/consulting-and-fulfillment-of-esap-reporting-obligations-to-the-ebrd-in-connection-with-the-construction-of-the-banie-3-wind-farm\/","title":{"rendered":"Consulting and fulfillment of ESAP reporting obligations to the EBRD in connection with the construction of the Banie 3 Wind Farm"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The Banie 3 Wind Farm project shows how to align the requirements of financing institutions with the practical fulfillment of environmental and reporting obligations.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Consulting and fulfillment of ESAP reporting obligations to the EBRD in connection with the construction of the Banie 3 Wind Farm<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Client: <\/strong>Energix Polska<br><strong>Location: <\/strong>Zachodniopomorskie Voivodeship<br><strong>Project: <\/strong>Construction of the Banie 3 Wind Farm<br><strong>Ansee\u2019s scope:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>preparation of a BMP (Biodiversity Management Plan),<\/li>\n\n\n\n<li>development of the CRM (Collision Risk Modelling for Birds) model and data collection,<\/li>\n\n\n\n<li>post-construction monitoring of birds and bats,<\/li>\n\n\n\n<li>advisory on the selection of an automatic wind turbine shutdown system to protect avifauna,<\/li>\n\n\n\n<li>construction supervision,<\/li>\n\n\n\n<li>cooperation with the EBRD on the ESAP reporting.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The Banie 3 Wind Farm project shows how to align the requirements of financing institutions with the practical fulfillment of environmental and reporting obligations. Consulting and fulfillment of ESAP reporting obligations to the EBRD in connection with the construction of the Banie 3 Wind Farm Client: Energix PolskaLocation: Zachodniopomorskie VoivodeshipProject: Construction of the Banie 3 [&hellip;]<\/p>\n","protected":false},"featured_media":12125,"template":"","categories":[],"branza":[],"class_list":["post-19382","case-studies","type-case-studies","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/ansee.pl\/en\/wp-json\/wp\/v2\/case-studies\/19382","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ansee.pl\/en\/wp-json\/wp\/v2\/case-studies"}],"about":[{"href":"https:\/\/ansee.pl\/en\/wp-json\/wp\/v2\/types\/case-studies"}],"version-history":[{"count":1,"href":"https:\/\/ansee.pl\/en\/wp-json\/wp\/v2\/case-studies\/19382\/revisions"}],"predecessor-version":[{"id":19383,"href":"https:\/\/ansee.pl\/en\/wp-json\/wp\/v2\/case-studies\/19382\/revisions\/19383"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ansee.pl\/en\/wp-json\/wp\/v2\/media\/12125"}],"wp:attachment":[{"href":"https:\/\/ansee.pl\/en\/wp-json\/wp\/v2\/media?parent=19382"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ansee.pl\/en\/wp-json\/wp\/v2\/categories?post=19382"},{"taxonomy":"branza","embeddable":true,"href":"https:\/\/ansee.pl\/en\/wp-json\/wp\/v2\/branza?post=19382"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}